Transport Infrastructure Projects
Çanakkale Ezine Ayvacık Küçükkuyu Road
Çanakkale Ezine Ayvacık Küçükkuyu Road
A divided road providing safe, uninterrupted transport between Çanakkale's coastal settlements
Çanakkale Ezine Ayvacık Küçükkuyu Road
Phase 1 construction: 2011 to 2013; Phase 2: 2013 to 2017; Phase 3: 2017 to 2022
Çanakkale Ezine Ayvacık Küçükkuyu Road
General Information
Çanakkale, whose glorious resistance holds a place in our nation's epic history, continues developing through its historical fabric, coastal, cultural and thermal tourism, agriculture and related industries. The city is an important crossing linking Asia and Europe and connecting the Black Sea and Marmara Sea to the world.
Technologies and Innovations Used
Project Stages
Construction Stages
01
Stage 1: Çanakkale Ezine Section
02
Stage 2: Çanakkale Ezine Ayvacık Section
03
Stage 3: Ayvacık Küçükkuyu Section (Assos and Troya Tunnels
Solutions
Modern engineering suited to terrain and environment, including grade separated intelligent interchanges and tunnels, combined with divided road standards to provide uninterrupted transport, improve safety and eliminate traffic problems, especially in summer.
Sustainability
Economic and Social Impact
Reduced lost working time, fuel use and carbon emissions saved TRY 463 million annually, contributing to the national economy. Opening improved access to regional tourism and trade, stimulating the local economy.
Sustainability and Environmental Sensitivity
Construction considered all environmental impact assessments. Opening as a divided road targets decades of service, creating an environmentally sensitive transport network in fuel consumption and carbon emissions.
Of the 84.00 km road connecting Çanakkale to Balıkesir and İzmir, 74.37 km opened in the first two phases. Assos and Troya tunnels in phase three prevented Kaz Mountains problems caused by summer traffic and winter weather. Improved physical and geometric standards increased route safety and driving comfort.
Gallery
Other Projects