TANAP Natural Gas Pipeline, Lot 4
A section of the transmission line carrying Azerbaijani gas through Türkiye to Europe
General Information
Modern equipment and low emission machinery reduced construction energy consumption.
Steel pipes from internationally certified suppliers ensured quality and long life.
Special crossing methods, HDD and microtunneling, protected water resources along the route.
Construction minimized effects on groundwater and surface water.
Welding and coating waste was separated and disposed of.
Excavated materials were assessed for reuse.
Site rehabilitation protected flora and fauna during construction.
Local materials and labor reduced the carbon footprint of logistics.
Continuous monitoring and maintenance systems ensured line safety.
Modern valve stations minimized environmental risks from potential leaks and emergencies.
Kalyon İnşaat undertook the Lot 4 segment and completed construction of a 472 km, 48 inch pipeline.